group of people sitting beside rectangular wooden table with laptops

Consulting Services

Take Control of Your Project Execution with Baseline CPM Scheduling

A weak or poorly structured schedule leads to project delays, cost overruns, and client disputes. Our Construction Scheduling Service provides contract-compliant Primavera P6 and MS Project baselines designed to track progress, control critical paths, and ensure target completion dates are met.

What We Offer

  • Comprehensive Level 1 to Level 4 WBS Development:

Structuring your work breakdown structure to align seamlessly with contract specifications, site logistics, and engineering disciplines (Civil, MEP, Structural).

  • CPM Logic & Dependency Mapping:

Linking all activities with realistic predecessor/successor relationships, eliminating open ends, excessive leads, and artificial constraints.

  • Resource & Cost Loading:

Assigning labor, materials, and equipment to calculate manpower peaks, cash-flow S-Curves, and budget forecasts.

  • Critical Path & Float Path Analysis:

Identifying primary, secondary, and tertiary critical paths using advanced Primavera P6 analysis to prevent delay risks before site work begins.

  • Monthly/Weekly Progress Updates:

Updating actual progress, calculating variances, and adjusting remaining durations to keep management informed.

Deliverables

  1. Fully compliant Primavera P6 (.XER) or MS Project (.MPP) baseline files.

  2. Native S-Curve charts (Manpower & Cash Flow) in Excel or Power BI.

  3. Executive Narrative Reports detailing critical path risks, float availability, and key milestones.